Commnity Consultation – 80 Butler & 12 Bay Street Byron Bay

RETIREMENT LIVING DEVELOPMENT

Location:

80 Butler and 12 Bay Streets Byron Bay


What is being proposed:

A carefully designed retirement living project to be known as “Oasis, Byron Bay”.


DA Detailed Description:

Please use this link for the detailed plans

What is being proposed?
A carefully designed retirement living project to be known as “Oasis, Byron Bay”.
The project is in the design development phase, and its final form is evolving. Currently, it is anticipated that
the Butler Street site will house about 200 senior living apartments. Further, it will provide about 2600m² of
floor space for wellness facilities, about 360m² for a wellness hub, and a further 300m² for recreation and
support facilities. The project will include a wide array of recreational facilities, including swimming pools,
tennis courts, community gardens, as well as changing rooms, toilets, showers, storage, and the like. A
children’s playground designed for active, imaginative play, as well as a fenced dog park for safe, off-leash
play and pet socialising, is proposed. The Buttler Street site will also have a centralised back-of-house
facility supporting the entire operation and caravan parking.
At Bay Street, a café will front the Street at ground level, and a range of change rooms, medical rooms,
yoga- and Pilates-type facilities, as well as a pool, will be provided. At levels 2 and 3, lounge, kitchen and
games areas are also envisaged.

Key Features:

  • World-class architecture
  • Sensitive design that complements the surrounding natural and urban character
  • Landscaped buffers and setbacks to protect neighbour amenity
  • Professional development management

Concerned About Development? Get the Facts
We know development proposals can cause concern. This project is being carefully designed to fit within
Byron Bay’s scale and style.

Why This Project?

  • To address some of the housing needs for seniors in the Byron Shire.

FAQs – click the expandable links below:

Who is the developer for this project?

DD Resort Living Byron Bay Pty Ltd & the Trustees for PHD Investments Trust (ABN 44 813 989 483) are the proponents for the retirement living development proposed at Butler Street with an associated clubhouse at Bay Street in Byron Bay.
Mr David Devine heads up this project. Since founding his first development company in 1984, David Devine has become one of Australia’s most respected property leaders. The hallmarks of a David Devine project are its timeless design and enduring quality.

Who is this accommodation for?

Approval of this project will permit people aged 60 or older or with a disability to reside at Oasis. People who can reside in the development also include those living in the same household as a senior or a person with a disability. Additionally, staff employed to assist with administration and the provision of services to the accommodation can reside in the development.

Why is this project needed in Byron Bay?

There are a number of reasons why redeveloping the existing caravan park for retirement living is desirable:

Location and infrastructure

• The existing Caravan park is well-located near the town centre, transport, shops and services — exactly what seniors need for independent living

• Existing utility connections (water, sewerage, power) are available to the site

• The site is flat and accessible, suited to mobility-friendly design

Housing supply and affordability

• The ageing population creates strong unmet demand for purpose-built seniors’ accommodation
• Well-designed retirement living projects can house far more people on the same site as a regular caravan park

Quality of living outcomes

Purpose-built retirement living offers better safety, accessibility and amenity than ageing caravan infrastructure
• Modern buildings are more energy efficient, better insulated and more efficient to run
• Retirement living projects often include shared facilities — communal spaces, gardens, care services — that improve residents’ health and social wellbeing

Economic considerations

Generates council rates revenue, construction jobs and ongoing economic activity
• Attracts private investment in aged care and retirement living sectors

Social and community benefits

Dedicated Retirement living communities can reduce social isolation
• Retirement living projects can free up larger family homes in the broader market if downsizers move in

What will the development look like? Will it fit with the character of the neighbourhood?

Yes. The project is being architecturally designed to blend in with the surrounding area, with features like:
✔️ Low-rise design (no high-rise or large-scale buildings)
✔️ Landscaping and tree planting to soften visual impacts
✔️ Building materials and colours chosen to reflect the local style
✔️ Thoughtful setbacks and buffer zones from neighbouring properties
The proponent is committed to designing sensitively to respect the look and feel of Byron Bay.

Who are the project team for this development?

A multidisciplinary team is involved in preparing the Oasis Byron Bay project. Key consultants are listed as follows:
Koichi Takada Architects and HGA Studio – Architects
GREEN CARE PROJECT – Landscape Architect
Biodiversity Australia – Environmental Consultant
Concise Certification – Building Certifier
ECL Power Services – Specialist Consultant
ENV Solution – Environmental Consultant
Douglas Partners – Geotechnical Engineer
Geolink – Bushfire Assessment Consultant
Gilbert and Sullivan – Environmental Consultant
Acoustic works – Noise Consultant
Partners Energy –BASIX Certifier
PLANIT Consulting – Civil Engineering and Traffic Consultants
PLANNERS NORTH – Town Planning Consultant

How will traffic and parking be managed?

A Traffic Impact Assessment will be undertaken as part of the planning process. The project will include on-site parking for residents, in accordance with Council requirements.
Traffic generation is expected to be low, given the character of retirement living projects and residents’ ability to walk, cycle, or use on-site minibus transport.

What will happen to the existing residents at the site?

The primary law that covers caravan parks with permanent residents is the Residential (Land Lease) Communities Act 2013 (known as “land lease communities”). Permanent residents have rights and obligations under both this Act and the Residential Tenancies Act 2010. This Act has strong controls on when an operator may give a permanent resident a termination notice if the caravan park is to close and be used for another purpose. Further, if a permanent resident is given a termination notice for closure or a change of use, the operator must try to help find new accommodation. If there is any dispute about termination, relocation, or compensation, residents can apply to the NSW Civil and Administrative Tribunal (NCAT).

How is this project permissible?

Retirement living projects are in town planning law terms “seniors housing”. Seniors housing is permitted at this 80 Butler Street site under the Byron Local Environmental Plan 2014 and is also permissible under the State Environmental Planning Policy (Housing). The Bay Street “clubhouse” is, in town planning terms, a mixed-use development involving a “respite day care centre” for a large part of the activities carried out on the site and at the frontage, a “Restaurants or cafes” land use. Both of these land uses are permissible under the E1 Local Centre zoning at the Bay Street site.

Who will make the final decision concerning the development approval for the project?

Statement Environmental Planning Policy (Planning Systems) 2021 specifies whether projects are “State Significant Development” or “Regionally Significant Development”. If the project included an element that provided a “residential care facility”, then the application would have been a State Significant Development Application and would not be lodged with Byron Shire Council. Because the development has an estimated cost exceeding $30 million, it is designated as a “Regionally Significant Development”. This means that Byron Shire Council will receive the development application, manage the public exhibition of the development application and complete a full assessment of the application. However, the Regional Planning Panel will make the final decision in relation to the project.

Will this increase noise or impact neighbourhood amenity?

We understand that neighbourhood amenity is important. The proponents’ goal is for the development to integrate quietly and respectfully into the existing community.

Is this social housing or public housing?

No. This is not government-funded social housing. It is a private retirement living project.

How does this project support local businesses?

By providing housing for seniors:
✔️ Help local businesses retain staff
✔️ Reduce commuting pressures
✔️ Support Byron Bay’s economy by keeping more people living locally and spending locally

How does this project align with Council and State housing strategies?

The project aligns with both:
Byron Shire Council’s Residential Strategy 2041
NSW Government Regional Housing Taskforce Recommendations

Will there be further community consultation?

We are currently seeking feedback from residents, businesses, and other stakeholders.
You can:
→ Attend one of our drop-in sessions
→ Complete our online feedback form
→ Contact our team directly
All community feedback will be summarised in a Community Engagement Outcomes Report submitted with our Development Application to Byron Shire Council.

When will the development start and how long will construction take?

Construction is estimated to commence in mid-2027. Construction activity will run for approximately 3 years.

Will the development include environmental sustainability features?

Yes. The project will incorporate sustainable design principles, such as:
✔️ Water-sensitive landscaping
✔️ Energy-efficient fixtures
✔️ Passive design to reduce energy use
✔️ Encouragement of low-car living through location near services and public transport

Will this set a precedent for more dense developments in Byron Bay?

Every development application in Byron Shire is assessed on its own merits against the planning controls that apply at the time. This project is being specifically designed to meet current zoning and planning controls, as well as guidelines for apartment design and seniors housing. Further, the design is being tailored to address a community need.

What measures has the development considered regarding flooding?

The Butler Street buildings will be elevated above flooding and designed with materials that cannot be impacted by flood waters. Services such as electrical and heating/ventilation will be placed above maximum flood levels, further increasing the flood resilience of the building for well-designed retirement living accommodation.

How can I have my say or ask more questions?

We want to hear from you!
See feedback form linked here
→ Attend the community information session Wednesday 10 June 2026 (bookings required)
→ Contact our team directly (consultation@plannersnorth.com.au)
Your feedback will help shape the final proposal before submission.

We need to receive any comments or suggestions you have before 5pm of 18 June 2026.